Baraa Noura The Oasis Specialist Join WA ChannelWhatsApp Me

Article

Snagging Guide for New Villas

2 min read · By Baraa Noura · Updated 5 November 2026

A professional inspection of your new villa before you accept the keys, so every defect is fixed by the developer, not by you.

Why snagging matters

A snag is any defect or unfinished detail in a new home: a cracked tile, a door that sticks, a slow drain, a socket that doesn’t work. Almost every new villa has a few.

Before handover, the developer fixes them at no cost to you. Once you have signed and taken the keys, getting repairs done is slower and harder. An inspection gives you a written, photographed list to put in front of the developer while you still have the leverage.

When to do it

  • At handover: as soon as the developer invites you to inspect, and before you sign the handover documents.
  • Buying resale: before transfer, so repairs or a price adjustment can be agreed with the seller.
  • Before the defects period ends: developers usually cover defects for a set time after handover, often 12 months. Check your documents, and inspect again before it closes to catch anything that has appeared since.

What an inspection covers

  • Walls, ceilings and paint: Cracks, uneven finish, patchy paint, marks and damp stains.
  • Doors and windows: Alignment, locks, handles, seals and smooth opening and closing.
  • Electrical: Every socket, switch and light, plus the distribution board and labelling.
  • Plumbing and water: Taps, showers, drains, water pressure, hot water and any sign of leaks.
  • Air conditioning: Cooling in every room, thermostats, noise, drainage and vent condition.
  • Kitchen and joinery: Cabinets, hinges, worktops, wardrobes and fitted units.
  • Floors and tiles: Cracked, hollow or uneven tiles, grout, skirting and thresholds.
  • Outdoors: Garden, pool, driveway, boundary walls, drainage and external lighting.
  • Safety and extras: Smoke alarms, balcony and stair railings, gates, intercom and meters.

How it works

  1. 1

    Message me

    Tell me the villa, the cluster and your handover date, and we agree a time.

  2. 2

    Full inspection

    Every room, system and outdoor area is checked and tested, with photos of each issue.

  3. 3

    Written snag list

    You receive a clear, photographed list of defects, ready to hand to the developer.

  4. 4

    Fix and re-check

    The developer repairs the items, and the villa is checked again before you accept the keys.

Before you go

  • Keep your handover letter and the unit’s floor plan to hand.
  • Inspect in daylight, so paint and tile faults show.
  • Do not sign any “accepted as is” paperwork until the snag list is closed.
  • Keep the list and the photos. They are your record if an item comes back.
Baraa Noura

Baraa Noura

The Oasis Specialist, AX CAPITAL Real Estate.

Looking for a Villa in The Oasis?

Tell me your budget, bedrooms and preferred cluster, and I'll send you the villas that fit, including off-market options.

Related Guides

Explore the Clusters

WhatsApp Call Channel

Subscribe To My Oasis Newsletter

Market updates, resale opportunities and new launches in The Oasis, sent to your inbox. No spam.