Article
Snagging Guide for New Villas
A professional inspection of your new villa before you accept the keys, so every defect is fixed by the developer, not by you.
Why snagging matters
A snag is any defect or unfinished detail in a new home: a cracked tile, a door that sticks, a slow drain, a socket that doesn’t work. Almost every new villa has a few.
Before handover, the developer fixes them at no cost to you. Once you have signed and taken the keys, getting repairs done is slower and harder. An inspection gives you a written, photographed list to put in front of the developer while you still have the leverage.
When to do it
- At handover: as soon as the developer invites you to inspect, and before you sign the handover documents.
- Buying resale: before transfer, so repairs or a price adjustment can be agreed with the seller.
- Before the defects period ends: developers usually cover defects for a set time after handover, often 12 months. Check your documents, and inspect again before it closes to catch anything that has appeared since.
What an inspection covers
- Walls, ceilings and paint: Cracks, uneven finish, patchy paint, marks and damp stains.
- Doors and windows: Alignment, locks, handles, seals and smooth opening and closing.
- Electrical: Every socket, switch and light, plus the distribution board and labelling.
- Plumbing and water: Taps, showers, drains, water pressure, hot water and any sign of leaks.
- Air conditioning: Cooling in every room, thermostats, noise, drainage and vent condition.
- Kitchen and joinery: Cabinets, hinges, worktops, wardrobes and fitted units.
- Floors and tiles: Cracked, hollow or uneven tiles, grout, skirting and thresholds.
- Outdoors: Garden, pool, driveway, boundary walls, drainage and external lighting.
- Safety and extras: Smoke alarms, balcony and stair railings, gates, intercom and meters.
How it works
- 1
Message me
Tell me the villa, the cluster and your handover date, and we agree a time.
- 2
Full inspection
Every room, system and outdoor area is checked and tested, with photos of each issue.
- 3
Written snag list
You receive a clear, photographed list of defects, ready to hand to the developer.
- 4
Fix and re-check
The developer repairs the items, and the villa is checked again before you accept the keys.
Before you go
- Keep your handover letter and the unit’s floor plan to hand.
- Inspect in daylight, so paint and tile faults show.
- Do not sign any “accepted as is” paperwork until the snag list is closed.
- Keep the list and the photos. They are your record if an item comes back.
Looking for a Villa in The Oasis?
Tell me your budget, bedrooms and preferred cluster, and I'll send you the villas that fit, including off-market options.




